Monday, 29 August 2016

New Mining Yield and Cycle Times with Mercoxit

Astrogeology Lv.5 Mining Lv.5


Each value is per strip miner and each ship has 2 strip miners.
Each crystal is with the T2 strip miner or T2 deep core strip miner for Mercoxit
I excluded Fleet Mining Yields due to the new blog about new fleet bonuses and modeules.

If values change I will update this posting.

Retriever

With all T2 Mining Upgrades

T1 Strip Miner         1366 m3 @ 162 seconds
T1 Crystal                1480 m3 @ 162 seconds
T2 Crystal                1593 m3 @ 162 seconds
T1 Mercoxit               792 m3 @ 162 seconds
T2 Mercoxit               871 m3 @ 162 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              918 m3 @ 162 seconds
T2 Mercoxit            1010 m3 @ 162 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1407 m3 @ 162 seconds
T1 Crystal               1524 m3 @ 162 seconds
T2 Crystal               1641 m3 @ 162 seconds
T1 Mercoxit              946 m3 @ 162 seconds
T2 Mercoxit            1040 m3 @ 162 seconds


Procurer

With all T2 Mining Upgrades

T1 Strip Miner         1253 m3 @ 162 seconds
T1 Crystal                1357 m3 @ 162 seconds
T2 Crystal                1462 m3 @ 162 seconds
T1 Mercoxit               726 m3 @ 162 seconds
T2 Mercoxit               799 m3 @ 162 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              843 m3 @ 162 seconds
T2 Mercoxit              927 m3 @ 162 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1291 m3 @ 162 seconds
T1 Crystal               1398 m3 @ 162 seconds
T2 Crystal               1506 m3 @ 162 seconds
T1 Mercoxit              868 m3 @ 162 seconds
T2 Mercoxit              955 m3 @ 162 seconds


Convetor

With all T2 Mining Upgrades

T1 Strip Miner         1366 m3 @ 121.5 seconds
T1 Crystal                1480 m3 @ 121.5 seconds
T2 Crystal                1593 m3 @ 121.5 seconds
T1 Mercoxit               792 m3 @ 121.5 seconds
T2 Mercoxit               871 m3 @ 121.5 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              918 m3 @ 121.5 seconds
T2 Mercoxit            1010 m3 @ 121.5 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1407 m3 @ 121.5 seconds
T1 Crystal               1524 m3 @ 121.5 seconds
T2 Crystal               1641 m3 @ 121.5 seconds
T1 Mercoxit              946 m3 @ 121.5 seconds
T2 Mercoxit            1040 m3 @ 121.5 seconds


Hulk

With all T2 Mining Upgrades

T1 Strip Miner         1366 m3 @ 114.2 seconds
T1 Crystal                1480 m3 @ 114.2 seconds
T2 Crystal                1593 m3 @ 114.2 seconds
T1 Mercoxit               792 m3 @ 114.2 seconds
T2 Mercoxit               871 m3 @ 114.2 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              918 m3 @ 114.2 seconds
T2 Mercoxit            1010 m3 @ 114.2 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1407 m3 @ 114.2 seconds
T1 Crystal               1524 m3 @ 114.2 seconds
T2 Crystal               1641 m3 @ 114.2 seconds
T1 Mercoxit              946 m3 @ 114.2 seconds
T2 Mercoxit            1040 m3 @ 114.2 seconds


Skiff

With all T2 Mining Upgrades

T1 Strip Miner         1366 m3 @ 155.5 seconds
T1 Crystal                1480 m3 @ 155.5 seconds
T2 Crystal                1593 m3 @ 155.5 seconds
T1 Mercoxit               792 m3 @ 155.5 seconds
T2 Mercoxit               871 m3 @ 155.5 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              918 m3 @ 155.5 seconds
T2 Mercoxit            1010 m3 @ 155.5 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1407 m3 @ 155.5 seconds
T1 Crystal               1524 m3 @ 155.5 seconds
T2 Crystal               1641 m3 @ 155.5 seconds
T1 Mercoxit              946 m3 @ 155.5 seconds
T2 Mercoxit            1040 m3 @ 155.5 seconds


Mackinaw

With all T2 Mining Upgrades

T1 Strip Miner         1366 m3 @ 155.5 seconds
T1 Crystal                1480 m3 @ 155.5 seconds
T2 Crystal                1593 m3 @ 155.5 seconds
T1 Mercoxit               792 m3 @ 155.5 seconds
T2 Mercoxit               871 m3 @ 155.5 seconds

With Medium Mercoxit Mining Crystal Optimization Rig

T1 Mercoxit              918 m3 @ 155.5 seconds
T2 Mercoxit            1010 m3 @ 155.5 seconds

With Highwall Mining MX-1003 Implant

T1 Strip Miner        1407 m3 @ 155.5 seconds
T1 Crystal               1524 m3 @ 155.5 seconds
T2 Crystal               1641 m3 @ 155.5 seconds
T1 Mercoxit              946 m3 @ 155.5 seconds
T2 Mercoxit            1040 m3 @ 155.5 seconds


2 comments:

  1. How many MLU's are factored into these setups? Any?

    ReplyDelete
    Replies
    1. Hi, Sorry about the delay. You are the first comment I have had here. All the setup are maxed out on T2 MLU. Mercoxit numbers includes Rig.

      Delete